← All work

Manufacturing / steel fabrication

Manufacturing, on one schedule.

A production-control prototype for a steel fabrication shop.

Working prototype · Not in production use

Steel fabrication prototype showing a production schedule with worker assignments and colour-coded jobs

Manufacturing / steel fabrication · Working prototype · Not in production use

The problem

Where the work gets stuck.

A production plan has to account for people, equipment and overlapping jobs. When a delivery slips or a worker is out, the shop needs to see what moves with it.

What AE built

A system around the task.

  • An eight-week schedule with assignments by worker, job and day
  • Crew qualifications and weekly workload alongside the production plan
  • Disruption simulation to explore how a delay affects the schedule
  • Job hours and a weekly production summary in the same application
Apex Steel demo crew screen showing qualifications, weekly hours and current assignments

Crew qualifications and workload · Demo records

What changed

What the build makes possible.

The prototype puts the production plan, crew availability and job assignments in one working interface. Production-week results have not been measured.

The evidence

What you can see here.

Supplied views of the production schedule and crew screen. The crew view uses Apex Steel demo branding and sample records; the schedule view carries Worth Steel branding. These show the application, not a client endorsement.

Talk through your system

Next step

Tell me what part of the week keeps breaking.

Thirty minutes, no pitch. If it is cheaper to live with than to fix, you get told that. Based in Southlake, so an in-person visit is on the table.